1014 - Wastewater Treatment Facility Install/Support

 

Software Packages

  • RSLogix 500
  • RSView Active Display Server / Client

This system was installed for a city wastewater treatment facility by a separate general contractor via standard bid and spec process. HEI was contacted to complete the installation and commission the facility under T & M contract.

All OEM systems were required to have AB SLC505 PLCs installed and be capable of Ethernet communications. It was required to coordinate and debug all facets of the system including HMI’s, PLC’s, and PC based systems for site built process components and HMI all OEM systems.

The HMI system included two RSView32 servers. One sever supports the RAD server and 5 client nodes in the administration building, while the other handles redundant alarming and data logging as well as the after hours dial out functions. In addition, 3 runtime HMI nodes were placed throughout the facility for operator interface with touchscreens, adding an additional layer of redundancy.

HEI provided the start-up engineering and support programming to the general contractor insuring successful completion of this Sequencing Batch Reactor wastewater facility. Subsystems that were coordinated include influent pump stations, SBR basins, flocculation basins, filtration equipment, ultra violet disinfection systems, non potable water pumping, irrigation pumping, belt filter press, and re-aeration basins controls.

Hardware Basis

  • Intel PCs
  • Dell Servers
  • ELO Touch Screen
  • Allen-Bradley SLC505
  • 3Com Hubs

Communications

  • Ethernet Peer to Peer and HMI
  • Media: Ethernet
    • Cat 5
    • Fiber